Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13690775

- Product Categories
- Friendly Links
Information Name: | Solar rig | rig | Long industry machinery |
Published: | 2015-04-11 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Water well drilling rig operated insurance regulations 1. Work address should adhere to clean. 2. wells rig equipment and demolition, accurate and complete to protect intact. 3. well drilling rig mast lift, the operator should conduct long standing position of peace. 4. start electric motor, water well drilling rig should be open to all and everything is friction. 5. When the drilling rig work, brick tiles, is strictly prohibited to lost guard. 6. Before beginning work, check the reliability of the new dragon rig should brake installed, as well as the functioning of the friction clutch with starting device, mobile fuel trucks. 7. Before the end of the motor is not prohibited to review drilling rig. 8. work well drilling rig, rig fastening prohibited any machine. 9. When the drilling rig operation, refueling is prohibited. Mast upper pulley should be at the refueling rig stagnation. 10. Before the motor is not stopped, not allowed to work on the mast. Submersible drilling rig base construction requirements submersible drilling rig at work also needs to build a base, set up base at the time machinery must be based on the type of machine, the job requirements to build, do not say otherwise inappropriate Chinese rig, but also likely to cause mechanical damage. So we set up a base in time to pay attention to? 1, should be based on the type of rig, drilling depth and regional conditions designed base structure type is selected. Regardless of the base (the base wood, concrete, steel channel and beam, etc.) must be to ensure stability, Zhou Zheng, level. Steel submersible drilling rig base: should be installed using the instructions provided, and shall not use a cracked beam distortion channel and do the ground beam. In the steel base below the main focus should be good mat board, sleepers. Submersible drilling rig concrete base: drill, cement, sand, gravel required for the pouring of concrete volume ratio of 1: 3: 6; especially loose formation of 1: 2: 4. Pouring of concrete with sand, gravel should be cleaned solar photovoltaic rig with cement to mix well; perfusion want tamping, pay attention to the conservation after perfusion; and carefully check the mutual distance between the screw, to meet the design requirements, not biased oblique. 2, in the four corner towers, submersible drilling rig should be the focal point and the aperture laying around the upper and lower layers of the base material of tough wood, when the case of deep and loose soil with concrete reinforcement in the lower solar rig | rig | Long industry machinery provided by Shandong Machinery Co., Ltd. Dragon. Industry Machinery Co., Ltd. Shandong Long (www.longyejixie.com) strong, credible, in Tai'an, Shandong Engineering Machinery Parts industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead industry machinery and you work long into the brilliant, for a better future! |
Admin>>>
You are the 37604 visitor
Copyright © GuangDong ICP No. 10089450, Lung Machinery Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 37604 visitor
Copyright © GuangDong ICP No. 10089450, Lung Machinery Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility