Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13690775

- Product Categories
- Friendly Links
Information Name: | Solar pile drilling rig, Long industry machinery (certified), rig |
Published: | 2015-04-28 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | 1. No matter what the situation well drilling rig operated under the insurance regulations, when a segment of the mast was working under the mast other staff are not allowed to stay. 2. In the event nasty weather (rain, snow, ice, or more than five years the night wind), not allowed to work on the mast, hydraulic filters. At the same time, it does not permit the use of artificial lighting in the mast. 3. Do not use wire rope split shares. 4. landing drill, strictly prohibited to touch the rope. 5. In addition to elevating drilling rig, drill pipe endures, wellhead prohibited open. 6. In order to avoid drilling or swinging out of the tube pulled from the well when the well outside, must be applied by a hook 15 ~ 20mm diameter steel bars made of hook. 7. cleaned out of the tube when the PV pile hole drilling machine, should be applied firmly precarious rope looped pile drilling rig, set in the lower end of the pump cylinder, which was spilled, chlorosulfonated polyethylene. 8. Use the pulley casing when a promotion or landing and mechanical rig during salvage work, all workers should be separated from the drilling. 9. When the sleeve is pulled out with a crane, in order to prevent the sleeve off, must be fixed to each other all the way. 10. In the case of lighting the next stop (at night), the water well drilling rig work should be stopped. This time when the well is still drilling, the drill should be vigilant taken out from the well. Rig equipment for installation procedures and requirements 1. Base: The left and right front base by drawing a line based on the orientation of the place, so that the project in front of the base of the rig about signs alignment. 2. Equipment turntable drive device: rotary drive device in the factory's equipment is already looking positive. When admitted without any unsafe elements, it will dial drives all hanging in device orientation, pierce 8 pin adapter rig manufacturers, should be pierced pin attention from the outside to the middle of the wellhead wellhead, respectively with a pin and a locking pin axis. 3. Equipment Engineering rig winch: Winch at the factory before equipment is alignment and orientation of the substructure corresponding with welded positioning block. When the field device to the base of the hoist winch winch beam, press the positioning block positioning, fastening bolts M36 * 120 the winch base and the substructure fixed. 4. The device engineering drill guides and BOP mobile Exposure: See Detailed Equipment Process Engineering rig substructure using manual. 5. Equipment derrick: derrick in accordance with instructions of the device. 6. Equipment crane: first to the top of the derrick crane hanging, so that the top shelf derrick crane positioning pin to pierce dowel holes. 7. Equipment tour, hook, put hoisting rope, crane and traveling drilling engineering drilling rope, and hung lifting tripod. Solar pile drilling rig, Long industry machinery (certification), the rig by Dragon Machinery Co., Ltd. Shandong. Machinery Co., Ltd. Shandong Long (www.longyejixie.com) is Tai'an, engineering machinery parts leaders, over the years, the company implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Lung industry machinery leadership with the staff warmly welcome all inquiries negotiations to create the dragon industry machinery better future. |
Admin>>>
You are the 37604 visitor
Copyright © GuangDong ICP No. 10089450, Lung Machinery Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 37604 visitor
Copyright © GuangDong ICP No. 10089450, Lung Machinery Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility