Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13690775

- Product Categories
- Friendly Links
Information Name: | Crawler water well drilling rig, drilling rigs, Long industry machinery |
Published: | 2015-06-22 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Hydraulic Drilling Rig Hydraulic advantages advantage more and more, crawler drilling rig, hydraulic drilling rig Why popular? Full hydraulic drilling site has powerful adaptability, flexible turn Yang superior ability, simple, flexible control, which allows users to more approachable By meters experimental examination of drilling machines, the reliability is arranged in the minimum requirements on the rig, rock drill shank cushion to protect, enhance life brings shank; three sections adjustable stroke, according to the geological conditions for optimum drilling, hydraulic architecture brings is efficiency and energy conservation, the standard conditions of cobalt-hole fuel consumption of less than 0.6M / L. Hydraulic systems are particularly catching rabbits with a secondary anti-sticking protection for your life greatly improved solder, drill, reliable, easy to change brazing agency, then solder / unloading solder such as heart wants, reasonable power distribution and build a full cylinder, hydraulic crawler drilling rig, the respective actuators work in coordination, the humane layout, so maintenance, easier maintenance, maintenance parts and maximize domestic consumption village, allowing you to use more low cost. Drill a regular inspection of the project, the main structure of the rig situation, structural connector bolts connecting pin structure, each structure welding, basket structure and safety status check / crawler rig blast, especially approach Before use, the unit should be a qualified test its safety performance, qualified before use; 2, a variety of regular power head, operating cylinder, check the condition of the drill bit; 3, regular anti-roll wire rope hoist unlocking means and both sides edge height, roll wall situation, the rope tail number of weeks to check on the reel, in particular the situation of the stop opening the key projects should be checked at any time; 4, check the electrical system, the main inspection project: a dedicated electrical box set and short-circuit protection and leakage protection devices, emergency off switch, electrical boxes damping device, fixed, lighting circuits, on the ground working device is prohibited for cable carriers zero lines. Crawler water well drilling rig, drilling rigs, dragon industry machinery provided by the Shandong Machinery Co., Ltd. Dragon. Crawler water well drilling rig, rig, Shandong Dragon Dragon Industry Machinery Industry Machinery Co., Ltd. (www.longyejixie.com) this year introduced a new upgrade, the above picture is for reference only, please call the telephone or pictures on this page, for the latest Information, Contact: Guo Lei. |
Admin>>>
You are the 37604 visitor
Copyright © GuangDong ICP No. 10089450, Lung Machinery Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 37604 visitor
Copyright © GuangDong ICP No. 10089450, Lung Machinery Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility