Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13690775

- Product Categories
- Friendly Links
Information Name: | Compressor rig manufacturers | compressor rig | Long Industry Machinery |
Published: | 2015-06-27 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Applications Applications anchor rig Anchoring drilling rig: The rig model is mainly used in power plants, road and rail mountain slope control anchor reinforcement, tunnel pipe - shed support, foundation piles anchor cable-stayed, anti - floating anchor, ground source heat pump wells, embankment reinforcement, hydropower dam foundation and dam seepage treatment, drainage holes, mine and quarry blast hole, micro pile hole and other projects, air compressor rig prices, especially suitable for use in bleaching, eggs, crushed gravel stratum and strong weathered rock formations deep hole covered with tube drilling, drilling a variety of techniques can be used, in particular, to reflect its efficient, high-quality performance, to achieve the purpose of rapid drilling through complex formation, air compressor rig Which is good, it has broad application prospects in various types of rock and soil anchoring project. The five well drilling rig drilling rig installation steps for its unique design, high efficiency and many other advantages are widely used in small mines, roads, rock engineering, blast hole drilling. It is an ideal tool for mining and stratification hole blasting choice. Today small to introduce a five well drilling installation steps: 1. First make sure the water well drilling rig is installed by a skilled operator to carry out, the air compressor rig, and a person responsible for directing. 2. Second, install the rig before deciding to deal with topography, geology, hydrology, meteorology and flood level to conduct a comprehensive investigation. 3. On a flat field by drilling rig derrick installation instructions required to install the base, tower, anchor and so on. The next scheduled opening flat piece solid grounds, Shaanxi compressor rig, an area not less than 53.3㎡, put before the wellhead tower portion may not be smooth, but not higher than 1m there are obstacles. 5. When the water well drilling rig installed after ground beams, the diesel engine drives, winch fixed base in the bottom of the drill. Compressor rig manufacturers | compressor rig | Long industry machinery supplied by Shandong Machinery Co., Ltd. Dragon. Machinery Co., Ltd. Shandong Long (www.longyejixie.com) strong, credible, in Tai'an, Shandong Engineering Machinery Parts industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead industry machinery and you work long into the brilliant, for a better future! |
Admin>>>
You are the 37604 visitor
Copyright © GuangDong ICP No. 10089450, Lung Machinery Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 37604 visitor
Copyright © GuangDong ICP No. 10089450, Lung Machinery Co., Ltd. Shandong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility